As per SEC requirement the GIS operations ( Open /Close) should be like below.
GIS Local Cubicle Control panel contain one multi position switch
There are four position available
1.Emergency
All operation should be in LCC panel Open/close switches
2.Local
All operation should be through Bay Control relay mounted in LCC panel
Its checks all hoard wire interlock and BCU software interlock
3. Remote
All operation from HMI and SCADA
4. OFF
There is no operation from any where.
GIS Local Cubicle Control panel contain one multi position switch
There are four position available
1.Emergency
All operation should be in LCC panel Open/close switches
2.Local
All operation should be through Bay Control relay mounted in LCC panel
Its checks all hoard wire interlock and BCU software interlock
3. Remote
All operation from HMI and SCADA
4. OFF
There is no operation from any where.